View on map
Management
Recycling centres
Municipal bases
We are building a Service and Operations Centre at the Jakuševec location, whose construction is proceeding in stages. Outside plumbing, sewerage and hydrant network installations were built in the first stage and connected to the public networks. The main entrance and some of the roads, the gate, and the open carwash plateau were also built in the first stage. The second stage included the construction of the office building and boiler room, oil facility, locksmith’s workshop, and the lower unit of the glass pretreatment workshop, along with power line and telephone connections to outside networks (a new transformer station was built for this purpose). The third stage of construction of the Jakuševec Service and Operations Centre has been completed and has included the construction of the following facilities: covered outdoor storage, PET packaging pretreatment facility, south entrance and the access road leading thereto, and a service water well. A car wash was put in operation too.